THE POOL IS A CONCRETE SURFACED ‘L’ SHAPED 50M X 20M OLYMPIC POOL WITH A DEEP DIVING BOWL AT THE END. THE PROJECT TOOK 5 DAYS TO COMPLETE, USING JOHN‘S TEAM OF NINE PROFESSIONAL PAINTERS.
Key steps included:
Step 1: Pump out the pool
Step 2: Blast the surface with ultra-high pressure water to remove the old paint
Step 3: Repair any imperfections where required with cement render
Step 4: Paint with Luxapool’s Epoxy Primer Sealer
Step 5: Finish with 3 coats of Luxapool’s Epoxy 2-pack
Step 6: The Waverley College Olympic Pool also required the school crest painted onto the centre of the 50m pool.